Builders in Pakistan quote for a house in two stages: the grey structure and the finishing. Knowing what's in each helps you compare quotes and avoid surprises.
Grey structure
The grey structure is the shell of the house β everything that holds it up and keeps the weather out:
- Excavation and foundations, including the damp-proof course.
- Columns, beams and roof slabs (reinforced concrete).
- Brick walls, inside and out.
- Plaster on walls and ceilings (usually included β check your quote).
- Pipes and conduits laid in the walls and floors for plumbing, drainage and electrical wiring.
- The boundary wall, stairs and water tanks.
Finishing
Finishing turns the shell into a home β and it's where costs vary most:
- Floors: tiles, marble or wooden flooring.
- Woodwork: doors, windows, kitchen cabinets and wardrobes.
- Bathrooms: sanitary fittings, taps, geysers.
- Electrical: wiring, switches, lights, fans.
- Paint, false ceilings and any decorative work.
What changes the cost most
- Finishing quality. Imported tiles, solid wood and branded fittings can cost several times more than local standard ones.
- Basement. A basement adds a lot to the grey structure.
- Covered area. Cost is mostly per square foot of covered area, so double storey vs single storey matters more than plot size.
- Labour-only or with material. A labour rate contract means you buy the materials; a with material contract means the builder does. Labour-only can save money but needs your time and checking.
Get your estimate
Our construction cost calculator gives a first estimate for any plot size, split into grey structure and finishing. Use it to check builders' quotes are in the right range.
Before you start
- Get the building plan approved by your society or development authority.
- Agree a written contract with a payment schedule tied to stages (foundations, slab, plaster, handover) β never pay far ahead of the work.
- Visit the site often, and keep photos of what's inside walls before they're plastered.